Prepare the opening and identify the supplied hardware before following the fitting sequence for your system.
01
Check the labelled components
Match the frame pieces and panels to the opening and approved layout. Protect the finished surfaces and check the supplied fixing and assembly instructions before starting.
02
Prepare the fixing surface
Confirm the surface is sound and the selected fixings suit it. Clear the reveal and protect nearby finishes. Locate obstructions before drilling.
03
Assemble and position the frame
Follow the supplied frame assembly sequence. Position the frame and check level, square and alignment before tightening the fixings fully.
04
Hang and align the panels
Support each panel as it is attached to the correct hinge position. Check even gaps and free movement before making the final adjustments described in the system instructions.
05
Check every moving part
Open each panel and rotate the louvres. Check handles, window operation and closing alignment. Avoid forcing a panel or overtightening a fixing to compensate for an uneven opening.
Final checklist
Parts and window labels matched
Suitable fixing surface confirmed
Mounting positions checked before drilling
All supplied safety fittings installed
Full movement tested
Product instructions and downloads
Use the current My Direct instructions for the exact system you order. They include the product-specific dimensions, hardware details and downloadable resources.