400+ 5 Star Reviews SureFit™ Protection Australia-wide delivery

Plantation Shutters

Plantation Shutters Installation Guide

Prepare the opening and identify the supplied hardware before following the fitting sequence for your system.

01

Check the labelled components

Match the frame pieces and panels to the opening and approved layout. Protect the finished surfaces and check the supplied fixing and assembly instructions before starting.

02

Prepare the fixing surface

Confirm the surface is sound and the selected fixings suit it. Clear the reveal and protect nearby finishes. Locate obstructions before drilling.

03

Assemble and position the frame

Follow the supplied frame assembly sequence. Position the frame and check level, square and alignment before tightening the fixings fully.

04

Hang and align the panels

Support each panel as it is attached to the correct hinge position. Check even gaps and free movement before making the final adjustments described in the system instructions.

05

Check every moving part

Open each panel and rotate the louvres. Check handles, window operation and closing alignment. Avoid forcing a panel or overtightening a fixing to compensate for an uneven opening.

Final checklist

  • Parts and window labels matched
  • Suitable fixing surface confirmed
  • Mounting positions checked before drilling
  • All supplied safety fittings installed
  • Full movement tested

Your next step

Keep the whole window in mind.

Take your measurements, photos and chosen material together when reviewing the final configuration.

0
Cart
Empty CartYour cart is emptyReturn to Shop
Secure Checkout
Fast Shipping
Easy Returns